Skip to content
Gateway LogisticsOOG · Kazakhstan

News

Caspian: Ro-Ro and a container quay are different jobs

  • Каспий
  • Ro-Ro
  • OOG

The Caspian crossing is not “a ferry ride in a day”. Kuryk to Baku / Alat in fair weather is about 18–24 hours. The delay is usually not the water. It is the queue for a vessel and a berth.

Kuryk was built for Ro-Ro and rail ferries: a truck or a wagon drives on. Aktau takes a heavier share of containers and dry bulk. Route a wheeled OOG piece onto a container quay and the combination waits behind someone else’s cargo and someone else’s crane scheme. That is not faster and not cheaper — it is a different job.

For OOG, Ro-Ro keeps the load on the lowboy or tandem: no crane lift, no re-lashing, no question whether the yard slab will take a concentrated footprint. A port lift makes sense when there is no ferry slot or the gauge will not pass the ramp. The call starts from the cargo, not from a corridor slogan.

Caspian queues in the 2025–2026 peaks ran to days and weeks. Until the fleet and the berths cover the peak, a haul timeline needs a ferry buffer — often longer than the road kilometres in Kazakhstan.

This is not a report on someone else’s shipments and not a claim to operate the ferry. It is a public industry cue for a road-plus-Caspian scheme.

Source: Практика портов Курык и Актау; отраслевые обзоры TITR, 2025–2026

Public industry facts. Not a claim to be the contractor, and not a list of completed jobs.